We participated in the delivery of the central part of the robotized line for BMW axles at the 2.1 Dingolfing factory. Interesting is the use of KUKA robots, whose 7th axis achieves a feed rate of 2.35 m/s. Our delivery included designing, manufacturing and assembling mechanical structures for robot transfer points and material logistics.

„This was a complete turnkey project for us. We delivered an electrical engineering design according to the end-user's regulations, manufactured switchboards, developed software and installed everything in the BMW plant.“